Friday, September 30, 2011

Renovation

At the beginning of September I began calling contractors for bids for painting, putting in new countertops and sinks and my kitchen and bath. Yes, the pink sink in the bath was on it's last legs. The plan was to go with basic things.  No big frills but to look updated.  I  had found pretty much everything I wanted from Mendards and the prices were really reasonable so I worked on a budge.  I ended up buying everything from Lowe's just because they had a little classer design but the cost was more.  The quality was pretty comparable to Menards, Lowes just had little tweeks that I really liked.  The labor costs to put them in were crazy but I went with a reputable contractor that I had worked with before.  I was only planning on replacing the stove and dishwasher but ended up getting a good deal on the refrigerator too.  By this time the budget was blown.  Long story short and several little incidentals that weren't in the budget but needed like hiring a plumber to hook up my water to that new refridgerator and things like that I'm finished with phase 1.  Phase 2 will be lighting and the installation of shelving for a new pantry in the kitchen closet.  Phase 3 new flooring & back door.  But the kitchen looks great and I'm so happy I did it.  I'm actually cooking again Yay!  This weekend is reserved for making some artwork for the soffets and wall.  It needs some life in it.   

Sunday, September 18, 2011